Its a Toy Hauler so I hope to have my motorcycle shipped from Louisiana so I can ride it on my down time.
Thursday, April 29, 2010
Back Online
So after a 7 month hold I am back in the patch. I am now working for Halliburton doing the same MWD work. I just finished a well for Chevron drilling on the Key 88 rig out of Coalinga, CA. I was able to take my day off to run back to Bakersfield and pick up the RV I have been looking at. I had a bit of a cold night after I incorrectly guessed how to heat this beast.

Its a Toy Hauler so I hope to have my motorcycle shipped from Louisiana so I can ride it on my down time.
Its a Toy Hauler so I hope to have my motorcycle shipped from Louisiana so I can ride it on my down time.
Subscribe to:
Posts (Atom)
